Directory: All Listings RSS

Filter listings...

A proceeding wherein a shipper/consignee seeks authority to abandon all or parts of their cargo.

Category:Sea Words

The utilization of solar energy through photosynthesis.

Category:Energy Terms

DD

Dry-Docking

Category:Abbreviations

CCP

Contolable Pitch Propeller

Category:Abbreviations

CTL

1.Constructive Total Loss. After an incident such as collision, grounding, fire, if it is too expensive to repair the ship cannot, the insurance consider it is lost. The vessel is abandoned or sold as scrap.2.Coastal Trade Limit service.

Category:Abbreviations

The order to go aloft (go up above).

Category:Sea Words

A tanker of such size as to take commercial advantage under Worldscale (generally, tankers 80,000-119,000 DWT) – A tanker with deadweight of 79,999dwt, however the term Aframax is generally used for tankers in the 50,000 – 100,000dwt capacity range.

Category:Abbreviations

AOR

Atlantic Ocean Region

Category:Abbreviations

TBT

Technical Barriers to Trade

Category:Abbreviations

Auxiliary Waste Heat Boiler Survey.

Category:Abbreviations

Activate, Activation

Category:Sea Words

TCV

Total Calculated Volume

Category:Abbreviations

Water Line-To-Hatch Coaming

Category:Abbreviations

Measured from the most forward part of the fore end to the most after part of the after end of the hull.

Category:Sea Words

Ramp fitted to a RoRo ship situated at the rear of the ship.

Category:Sea Words

Final date for delivering cargo to a liner ships.

A polariscope consisting of a specially constructed double plate polarizer and a tourmaline plate analyzer. Polarized light passing through the instrument is indicated by the presence of parallel colored fringes, while unpolarized light results in a unifo ...

Category:Meteorology

An architectural element for shading windows and wall surfaces placed on the exterior of a building; can be fixed or movable.

Category:Energy Terms

VSL

Vessel

Category:Abbreviations

BDI

Both Dates Inclusive

Category:Abbreviations